West Side 222 Reconstruction
June to October 2003

 

FoleysAtWorkStill
Foleys At Work Still?

JohnAndBobManage
John And Bob Manage the Project

LayingOutTheDraftBeams
Laying Out The Draft Beams

MaureenFoley
Maureen Foley Cleaning Journal Box

RolandCleansThreads
Roland Cleans Threads -every last bolt

TheCarArrives
The Car Arrives (it actually rolled)

TheFoleysAtWork
The Foleys At Work

WSLCo222-a
WSLCo222-a

WSLCo222-B-End
WSLCo222-B-End at arrival

WSLCo222-BlockingTheCenter
WSLCo222-Blocking the Center during unloading

WSLCo222-Deck
WSLCo222-Deck condition at arrival

WSLCo222-KenRobleSurveying
WSLCo222-Ken Roble Surveying the car on arrival



Page last modified on Apr 2, 03 11:31 pm by Andrew Cary using OpenOffice 1.02
Page best viewed using Internet Explorer or a Mozilla browser at 800x600 or better
© Society for the Preservation of Carter Railroad Resources 2003